Hi,
I have created a wip job for an outside processing item. and the requisition is created for the wip job.
now i need to cancel the wip job and it should automatically cancel the requisition too.
i tried that. however, cancelling wip job is not cancelling the corresponding requisition..
is there any setup to do this?
thanks in advance.
-- Rashmy