Manage flextime with OTL
Posted: 09 August 2007 02:50 PM   [ Ignore ]
Newbie
Rank
Total Posts:  1
Joined  2007-08-09

Is it possible to manage employee’s flextime with Oracle Time and Labor?.  The flextime should offer the possibility to accumulate some hours in a period, transfer these hours to the next period and use them to take time off during the next period.

Thanks.

Profile